SONI DS3 System Services Regulated Arrangements Awarded Contracts Gate 8
This publication presents the results of the DS3 System Services Volume Uncapped Gate 8 procurement.
EirGrid DS3 System Services Regulated Arrangements Awarded Contracts Gate 8
This publication presents the results of the DS3 System Services Volume Uncapped Gate 8 procurement.
System Margins Outlook Report 02.05
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
SONI Transmission Outage Summary 2023 (Week 18-19)
Summary of the SONI Transmission Outages over the next two weeks
System Margins Outlook Report 28.04
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
SONI Mid-Year Performance Report
The Evaluative Performance Framework commenced in 2022. It facilitates the assessment of SONI’s performance through two stages, the assessment of SONI’s Forward Work Plan (FWP) which is published by the end of September each year, and the assessment of SONI’s Annual Performance Report which is published by the end of December the following year. The purpose of this mid-year performance update is to provide an update on SONI’s delivery and performance in the year to date.
TSSPS Review Consultation Paper
Review of the Northern Ireland Transmission System Security and Planning Standards.