Connections Register- 03 April 2023.xls
Register of connections to the Northern Irish transmission grid as of 3rd April 2023 in excel format.
Connections Register- 03 April 2023.pdf
Register of Connections to the Northern Irish grid as of 3rd April 2023 in pdf format.
System Magins Outlook Report 03.04
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
Scheduling and Dispatch Assurance Report 2021
Independent Assurance Report on compliance with specified elements of the Scheduling and Dispatch process for the 12-month period ended 31 December 2021
SONI Transmission Outage Summary 2023 (Week 14-15)
Summary of the SONI Transmission Outages over the next two weeks