Grid Code

The Grid Code

The Grid Code details the technical requirements for connecting to and using the NI System. Compliance with the Grid Code is one of the requirements of connecting and using the Transmission System.

As the code administrator for the Grid Code, SONI maintains and oversees any proposed changes to it. All changes must be reviewed by the Grid Code Review Panel, consulted upon and approved by the Authority. For more information about the code please contact gridcode@soni.ltd.uk

The Grid Code can be found here.

To view a list of updates to the SONI Grid Code click here.

The Power Park Module Settings Schedule [RfG] can be found here.

The Wind Farm Settings Schedule [non RfG] can be found here.

The Synchronous Condenser Implementation Note can be found here .

The requirements for issuing Market Readiness Certificate can be found here.

Information relating to Conventional Generator Compliance Testing can be found here.

 


 

The Constitution of the Grid Code

The Grid Code Review Panel is a standing body established and maintained by SONI. The objective of the Panel is to keep the Grid Code and its working under review; to review all suggestions for amendments to the Grid Code; to determine recommendations for amendments to the Grid Code; to issue guidance in relation to the Grid Code and its implementation, performance and interpretation; and to consider what changes are necessary to the Grid Code arising out of any unforseen circumstances

The Constitution of the SONI Grid Code can be found here

Information from meetings of the Grid Code Review Panel can be found here



 

The Guidance for Modifications to the Grid Code can be found here.

The list of previously proposed Grid Code Modifications can be found here.

DSU Approved Modifications

Regulatory Approval Letter for Grid Code Modification application is available here.

Regulatory Approval Document 16112016 Outturn Availability is available here

Regulatory Approval Letter 16112016 Outturn Availability is available here

Regulatory Approved Document Power Park Module 16112016 is available here

Regulatory Approval Letter 16112016 Power Park Module is available here

Regulatory Approved Document Dynamic Models 16112016 is available here

Regulatory Approval Letter 16112016 Dynamic Models is available here

Regulatory Approval Letter 17122015 (retirement of plant) is available here

Regulatory Approval Letter 05102015 is available here

Regulatory Approval Letter 29092015 is available here

Regulatory Approval Letter 30042015 is available here

DSU 2013 Modification is available here

DSU Application Form Data Modification is available here

DSU Notice Time Modification is available here

DSU Signal Requirements Modification is available here

Proposed modifications to the SONI Grid Code in respect of Demand Side Units published 10th May 2013 is available here

Regulatory Approval Letter 05102015 is available here

Failure to Synchronise Grid Code Modifications (Clean) is available here

Failure to Synchronise Grid Code Modifications (Redline) is available here

WFPS Grid Code Modifications (Clean) is available here

WFPS Grid Code Modifications (Redline) is available here

Intraday Trading Grid Code Modifications (Comparison Result) is available here

Intraday Trading Grid Code Modifications (Modified Document) is available here

SONI Grid Code - Meter Code Modification can be found here

RoCoF Grid Code Modification 

RoCoF Grid Code Modification Report to NIAUR published 27 August 2013 is available here

RoCoF Grid Code Modifications (Clean) is available here

RoCoF Modifications Proposal - TSOs Opinion is available here

RoCoF Modification Consultation Paper is available here

PPM Setting Schedule RFG Changes Redline - February 2020

SONI Grid Code RfG Redline - February 2020

FERA modification on Minimum Aggregation Value is available here

DRAI modification on Maximum Down Time is available here

Grid Code Consultations

Grid Code Modification consultations are now performed through the SONI Consultation Portal which can be accessed via the following link.


 

Grid Code Consultations

Demand Side Unit System Operator Interface Agreement Consultation Paper - May 2023 available here

SONI Grid Code Maximum Continuous Rating Modification - Information Note available here

ESPS Modification Consultation Paper - 25 Nov 2022 available here

SONI Grid Code Consultation - Incorporation of Approved Grid Code Modification 1Hz per sec RoCoF available here

SONI Consultation Paper: Additional Solar PV Signals available here

Integration of Batteries Implementation Note available here

Battery ESPS Compliance Procedures available here

Battery ESPS Signal List available here

SONI Consultation on Meter Code Modification Proposals is available here

​SONI Consultation on Governance Rules and Constitution of the Grid Code is available here

SONI Grid Code Constitution March 2022 is available here

SONI Grid Code Governance Modifications is available here

SONI Grid Code Modification Proposal on Maximum Continuous Rating Requirement is available here

SONI Grid Code Modification Proposal on Updating the Metering Code is available here, Grid Code Modifications Redline Document available here.

FERA modification on Minimum Aggregation Value Consultation is available here

DRAI modification on Maximum Down Time Consultation is available here

UR RfG Grid Code Approval Letter October 2020 available here

SONI RfG Modification Proposals Consultation Paper May 2020 available here

PPM Setting Schedule Green Line Version RfG Mod Proposal May 2020 available here

PPM Setting Schedule Red Line Version RfG Mod Proposal May 2020 available here

Grid Code Green Line Version RfG Mod Proposal May 2020 available here

Grid Code Red Line Version RfG Mod Proposal May 2020 available here

PPM Setting Schedule Green Line Version RfG Mod Proposal July 2019 available here

PPM Setting Schedule Red Line Version - RfG Mod Proposal July 2019 available here

SONI Housekeeping and RfG Modification Proposals Consultation Paper July 2019 available here

SONI Grid Code Modification Proposal on Over-installed Units available here

SONI Consultation on Advanced Meter Reconcilation Consultation paper Appendix B is available here

SONI Consultation on Advanced Meter Reconcilation Consultation paper Appendix A is available here

SONI Consultation on Advanced Meter Reconcilation Consultation paper is available here

SONI Consultation on Advanced Meter Reconciliation Cover Letter is available here

SONI Consultation on Outturn Availability Grid Code Modification published 15 February 2016 is available here

SONI Grid Code Modification Proposal on Outturn Availability (clean) is available here

SONI Grid Code Modification Proposal on Outturn Availability (redline) is available here

Power Park Modules Grid Code Amendments Consultation Paper published 8 January 2016 is available here

Power Park Modules Grid Code Amendments Consultation Paper (Grid Code amendments - clean) published 8 January 2016 is available here

Power Park Modules Grid Code Amendments Consultation Paper (Grid Code amendments - redline) published 8 January 2016 is available here

SONI Consultation Information Letter on Notice of Intention to Disconnect due to Retirement of Plant is available here

SONI Consultation on Notice of Intention to Disconnect due to Retirement of Plant is available here

Dynamic Modelling Modification Consultation Introduction Report Final - published 2 December 2013 is available here

Draft Modelling SONI Grid Code Modification v4 redline - is available here

Demand Side Units - Grid Code Amendments Consultation Paper published 10 May 2013 is available here

Demand Side Units - Grid Code Amendments Consultation Paper published 1 November 2011 is available here

Demand Side Units - Grid Code Amendments Consultation Paper (Grid Code amendments - clean) published 1 November 2011 is available here

Demand Side Units - Grid Code Amendments Consultation Paper (Grid Code amendments - redline) published 1 November 2011 is available here

Process for the Calculation of Outturn Availability Consultation Document published 1 February 2013 is available here

Rate of Change of Frequency Modifications Grid Code Amendments Consultation Paper published 17 October 2012 is available here

Eirgrid response to the Consultation Paper on Treatment of Curtailment in Tie-break Situations (SEM-12-028) published 25 May 2012 is available here

Failure to Follow Synchronising Instruction Grid Code Amendments Consultation Paper published 23 May 2012 is available here

WFPS Ramp Rate Grid Code Amendments Consultation Paper published 8 November 2011 is available here

Grid Code Derogations

A derogation is a direction from the Utility Regulator relieving the applicant, licensee or non-licensee from its obligation to comply with a technical standard or code which may be required by a licence or by legislation. Derogations are issued in specific circumstances and have a specified duration.

A Guidance document on derogations can be accessed on the Utility Regulator website here.

A derogation request template can be accessed here.

The list of previously requested Grid Code Derogations can be found here.

European Network Codes

On 14 April 2016, Commission Regulation (EU) 2016/631 establishing a network code on requirements for grid connection of generators (hereafter referred to as ‘RfG’) entered in force. Regulation (EU) 2016/631. The incorporation of the RfG parameters into the Northern Ireland Grid Code was approved by the UR on 16.11.2018.

On 7 September 2016, the Commission Regulation (EU) 2016/1388 establishing a network code on requirements for demand connection (hereafter referred to as ‘DCC’) entered in force. Regulation (EU) 2016/1388. The incorporation of the DCC parameters into the Northern Ireland Grid Code was approved by the UR on 09.04.2019.

On 15 September 2016, Commission Regulation (EU) 2016/1447 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (hereafter referred to as ‘HVDC’) entered in force. Regulation (EU) 2016/1447. The incorporation of the HVDC parameters into the Northern Ireland Grid Code was part approved by the UR on 27.06.2019.

The European Network Codes page can be found here

Information on the application of the connection codes to existing users can be found here